(6901-002099 <00>)
6
1
1.
EFAB:
Attach pillars
[09]
to the tube assembly
[08]
using the small
head bolt
[15]
. Tighten with the allen key
[18]
.
2. Attach
feet
[13]
.
-
O
R -
3.
Attach carpet spikes
[17]
and nut
[16]
.
[08]
[09]
[15]
[18]
1
2
OPT
[13]
[08]
[16]
[17]
[08]
3