enough space
enough space
Positioning the posts so that they do not affect underground
objects (water supply, drain pipes, etc.).
When moving the posts, please follow the company
specifications.
Install it so that the exhaust of hot-water supply, heating
and/or the car do not hit directly to the products and do not
retain around products. There is a possibility that the
surface abnormality occurs as the coating film stripping.
Precautions during installation
Precautions during construction
The carport is a simple garage. Do not change or remodel it for storage, recreational or residential
purposes.
This product is for snow areas. It has a snow accumulation strength of 1500N/m
2
(153.0kg/m
2
), 3000N/m
2
(306.1kg/m
2
), 4500N/m
2
(459.2kg/m
2
) which corresponds to 50cm,100cm,150cm of snowfall. (specific
weight 0.3)
Do not install it in the place where snow slides down from the building roof directly.
When installing it besides concrete wall, etc., keep the enough clearance between the post and the wall
due to not clash each other during strong wind.
Do not install it in the place where the strong wind blow up the roof.
The precautions provided herein contain important information to ensure product performance, function,
strength and safety. Please be sure to follow them during construction.
Follow the instructions and be sure that all the specified screws and bolts for assembly are tightened securely.
Do not use anything other than the specified parts or optional parts.
The foundation should comply with or exceed dimension specifications.
Allow sufficient curing time for the concrete (4 to 7 days) and do not place heavy objects on it or subject it to
vibrations during the curing period.
Be sure to keep the note below to prevent aluminum materials corrode.
Do not use sea sand for the foundation since it
contains salt and may cause corrosion.
Do not use a cement enhancer, water-reducing
agent or cryoprotectant. They may cause the
posts to corrode.
Immediately wipe off any mortar or stains from
the surface of aluminum parts since they may
cause corrosion.
Be sure to provide gravel for the foundation to
allow drainage, insert water drainage holes (φ5)
at the base of the posts and foundation. Failure
to do so may lead to water accumulation inside
the posts and damage them if the water freezes
and expands inside.
sea
sand
cement
enhancer
water-
reducing
cryopro
tectant
water drainage
hole
(1)
(3)
(2)
2
Summary of Contents for CSS Series
Page 35: ...35...
Page 36: ...3 2016 11 1 2015 1 SG...