START-UP PROCEDURE
Argus Installation and Resource Guide
18
3.0
START-UP PROCEDURE
3.1
TESTING DETECTORS
•
Use a non-LED flashlight or striker to test each detector and assure that each detector
functions properly. If you don’t have an easy access mounting door, then pull off one
sensor to shine the flashlight through that hole.
•
Reset the panel after each test to assure that each detector signals the panel properly.
When the detector goes into alarm, the red Alarm Indicator (ALM) on the
corresponding Zone Card should light, and the horn/strobe should come on.
•
In the Machine Shutdown relay should trip the stop circuit of the production
machinery intended for stoppage.
•
Perform this test after installation of the system and repeat once a year.
Summary of Contents for Argus
Page 1: ...Installation and Resource Guide...
Page 2: ......
Page 29: ...SUPPLEMENTAL Argus Installation and Resource Guide 27...
Page 30: ...SUPPLEMENTAL Argus Installation and Resource Guide 28...
Page 31: ...SUPPLEMENTAL Argus Installation and Resource Guide 29...
Page 37: ...SUPPLEMENTAL Argus Installation and Resource Guide 35...
Page 38: ...WARRANTY Argus Installation and Resource Guide 36...
Page 40: ...Argus Installation and Resource Guide 38 This page left intentionally blank...