Confidential
5G Indoor CPE Installation Manual
17
Copyright © 2018, All Rights Reserved.
Category
Check Items
Criteria
Result
Pass
Fail
Power
Installation status of power
supply
Power supply capacity
Output voltage (tester)
Installation of circuit
breaker
Checking circuit breaker capacity
Cable specification
Checking the specification
Checking the limit distance
Cabling
Cable damage
Proper installation route
Compliance with the radius of curvature
Cable binding status
Binding status
Binding interval
Checking binding materials
Cable connection
Checking cable connection (Pin Map)
Input voltage
Assembly condition of a pressure
terminal and connector
Tightening condition of a pressure
terminal and connector
Checking compliance with tightening
torque value
Installation status of cable
tag
Position
Marking content
Checking tag installation method
Other data
cables
Cable specification
Checking the specification
Cabling
Cable damage
Proper installation route
Compliance with the radius of curvature
Cable binding status
Binding status
Binding interval
Checking binding materials
Cable connection
Checking cable connection (Pin Map)
Assembly condition of a connector
Tightening condition of a connector
Checking compliance with tightening
torque value
Installation status of cable
tag
Position
Marking content
Checking tag installation method
Others
Reserved ports
Checking port cap tightening status
•
Indoor: Dust cap
•
Outdoor: Water proof cap