Transporting and Unpacking
This section describes the work to unpack cabinets and other components and
transport them to the location to be installed.
Bringing in Items
Bring in items, taking care of the following:
•
When carrying the system, tighten the system firmly: do not exceed the proper
vibration level from 1 to 500 Hz.
•
While moving the system, the system should not be shocked physically or
damaged caused by dust, moisture, and static electricity.
Unpacking Items
The procedure to unpack items is as follows:
•
The packing items must be packed until they reach the installation place.
•
The items are classified in accordance with each job specification and stored
on a place that does not interfere with working.
•
Unpack only external packing, leaving the internal packing in unpacked status.
•
Unpack the inner packaging after each system is placed on its installation
location.
•
Scrap by-products (packaging waste) in accordance with the rule. Do not
recycle the by-products.
In the Box
Figure 4. Indoor CPE Package Contents