Completing the Installation
Installation
Outdoor unit
Check the external surface and the inside of the outdoor unit.
Is there any possibility of short circuit?
Is the place well-ventilated and ensures space for service?
Is the outdoor unit fixed securely?
Indoor unit
Check the external surface and the inside of the indoor unit.
Is the place well-ventilated and ensures space for service?
Check if the center of the indoor unit is ensured and it is installed horizontally.
Adding refrigerant
Is total number of connecting indoor units in the allowable range?
Are the length and the difference between the refrigerant pipes within the allowable range?
Is the Y-joint properly installed?
Is the pipe properly insulated?
Is the quantity of the additional refrigerant correctly weighed in?
Installing the drain pipe
Check the drain pipe of the outdoor unit and the indoor unit.
Have you completed the drain test?
Is the drain pipe properly insulated?
Installing the wiring
Have you performed the earthing work 3 to the outdoor unit?
Is 2-core cable used?
Is the length of the wire is in the limited range?
Is the wiring route correct?
Setting ADDRESS
Are the ADDRESSES of the indoor and outdoor unit properly set?
Check the following after completing the installation.