9. Commissioning & Recommissioning
Installer reference guide / Mono tank integrated type
173
9.3 Checklist before commissioning
Checklist before commissioning
Outdoor unit
Installation space is according manual (above average snow height/ enough clearances)
Yes
No
Outdoor unit is installed
higher / same level / lower , than the indoor unit.
Product is protected against direct wind on fan/ snow ingress
Yes
No
In case the product is installed close to sea, additional protection (coating) is applied
Yes
No
Outdoor unit is correctly secured to base
Yes
No
Provisions for condensate/ drainage are made, without any risk of freezing (tracing heating)
Yes
No
All external pipework is insulated
Yes
No
Power supply is installed with a dedicated correctly rated ELCB and correct cable sizing
Yes
No
Voltage between (*optional: in case of 3PH)
L1 - N
V~ L2 - N*
V~ L3 - N*
V~
Voltage between (*optional: in case of 3PH)
L1 - N
V~ L2 - N*
V~ L3 - N*
V~
Voltage
between
N
-
PE V~
Power supply is fitted with an isolator within in reach (arm length)
Yes
No
ELCB fuse rating (Amps)
A
Mains power supply cable size (mm2)
mm2
Communication cable size (mm2)
mm2
Communication cable shielded, single sided connected to PE
Yes
No
Additional refrigerant charge, split type (kg) (R32)
kg
R
Total charge (kg) (R32)
kg
R
Outdoor unit channel address setting (default is 00)
Outdoor unit noise restriction setting
No (default) -3dB -5dB -7dB max.35dB