
45
6)
After laying the product down and
disassembling the Shutter, separate the Leakage
Sensor terminal assembled on the Shutter.
7)
Separate the terminal of Circulation Motor.
8)
Disassemble the Circulation Motor and
separate it from the Sump assembly.
※
Check List
▶
Be careful of the residual water inside the unit
from prior wash
▶
Check the voltage at the connectors: 120VAC
▶
Check coil resistance: 16.5
Ω
(Measure after
removing connectors)
▶
PCB : Check CN1 -CN14 (120VAC)
Circulation Pump Disassembly Part 2
6.
7.
8.
6) After laying the product down and disassembling the Shutter, separate the
Leakage Sensor terminal assembled on the Shutter. 7) Separate the terminal of
Circulation Motor. 8) Disassemble the Circulation Motor and separate it from the
Sump assembly.
Summary of Contents for DMR57 Series
Page 2: ...2 Total Kitchen Design...
Page 11: ...11 Convenient Auto Drying...
Page 24: ...24 No Drain Troubleshooting...
Page 32: ...32 Peripheral Device Troubleshooting Part 2...
Page 67: ...67 Main PCB Connector Layout...
Page 71: ...71...