Disassembly and Reassembly
3-9
Samsung Electronics
3.4.2 ITB
3.4.3 Fuser
1. Unplug the one connector from OPE PBA and
pull out the ITB unit in the direction of bottom.
1. Remove the Right cover. And remove the 2
connector as shown below.
Caution -
The fuser is very hot. So turn the printer
off and wait until the printer to cool before
replacing it.
2. Remove the 4 screw, and move the shaft as
shown below. And remove the Fuser unit.
Summary of Contents for CLP-310
Page 42: ...Product spec and feature Service Manual 2 31 Samsung Electronics 2 3 11 Initailize Flow ...
Page 43: ...Product spec and feature Service Manual 2 32 Samsung Electronics ...
Page 143: ...Reference Information Service Manual 6 6 Samsung Electronics ...
Page 144: ...Reference Information Service Manual 6 7 Samsung Electronics ...
Page 145: ...Reference Information Service Manual 6 8 Samsung Electronics ...
Page 146: ...Reference Information Service Manual 6 9 Samsung Electronics ...