21
ENGLISH
f
Installing under floor heating
①
⑥
②
⑭
⑪
⑧
⑩
⑦
⑫
③
⑨
⑬
On site
installation
Ball valve (Used as
cleaning hole)
Water out
Water in
Under floor
heating coil
Hot water tank
Cleaning device
Hydro unit
Heat
exchanger
on water
side
④
⑤
①
Water pipe joint (union, flange)
⑤
Flexible joint
⑨
Expansion tank
②
Thermometer
⑥
Drain (within the product)
⑩
Temperature sensor for thermal storage tank
③
Manometer
⑦
Pump
⑪
Drain valve
④
Ball valve
⑧
Air vent
⑫
Strainer
⑬
Water Valve
⑭
Pressure relief valve (Pressure safety valve)
f
On site installation specification
Model name
Strainer
Flow meter
Thermometer
Manometer
Air vent
Pump
Ball valve Drain valve
AM160FNBF
✴✴
#50 PT 1
0~50 ℓ/min
0~100 °C
0~1 MPa
0.6 m
3
/h
(Condition:
0.15 MPa)
23 ℓ/min
PT 1
15 A
AM250FNBF
✴✴
0~100 ℓ/min
36 ℓ/min
ADN160BDE
✴✴
AM160FNBD
✴✴
0~50 ℓ/min
48 ℓ/min
ADN320BDE
✴✴
AM320FNBD
✴✴
0~100 ℓ/min
92 ℓ/min
(Refer to
pressure
drop graph)
ADN500BDE
✴✴
AM500FNBD
✴✴
#50
PT 1-1/4
0~150 ℓ/min
0~100 °C
0~1 MPa
0.6 m
3
/h
(Condition:
0.15 MPa)
150 ℓ/min
(Refer to
pressure
drop graph)
PT 1-1/4
15 A
k}tGokyvGo{ptXYWZ`]]hTXluUGGGYX
YWXZTW_TW]GGG㝘㤸G`a[[aY_