9
ENGLISH
DVM Hydro unit HT installation
Considering the vibration and weight of the DVM Hydro unit HT, strength of
the base ground must be strong enough to prevent noise and the top part of
the base ground has to be flat.
Fixed Bracket
Level Controller
Adjust the level controller to make fixed controller has to be min. 100 mm
higher than level controller.
100 mm
Place the DVM Hydro unit HT on the base construction and completely fix it
with the foundation bolt(M10), nut and washer.
The recommended length of foundation bolts are over 20 mm from the base
ground.
< A method of fixing the bracket >
k}tGokyvGo{ptXYWZ`]]hTXluUGGG`
YWXZTW_TW]GGG㝘㤸G`a[[aY\