13
AA
ENGLISH
Final Check and Trial Operation
To complete the installation, perform the following checks and tests to
ensure that the air conditioner operates correctly.
Check the followings:
t4USFOHUIPGUIFJOTUBMMBUJPOTJUF
t5JHIUOFTTPGQJQFDPOOFDUJPOUPEFUFDUHBTMFBL
t&MFDUSJDXJSJOHDPOOFDUJPO
t)FBUSFTJTUBOUJOTVMBUJPOPGUIFQJQF
t%SBJOBHF
t(SPVOEJOHDPOEVDUPSDPOOFDUJPO
t$PSSFDUPQFSBUJPO GPMMPXUIFTUFQTCFMPX
1. Press
the
Power
button and check the following:
X
The indicator on the indoor unit lights up.
X
5IFBJSøPXCMBEFPQFOTBOEUIFGBOHFBSTVQGPSPQFSBUJPO
1. Turn on the air conditioner and select Cool mode to run the compressor for 3 minutes.
2 . Release the valve caps on High and Low pressure side.
3 . Use L wrench to close the valve on the high pressure side.
4 . Approximately 2 minutes after, close the valve on the low pressure side.
5 . Stop operation of the air conditioner.
6 . Disconnect the pipes.
3. Press
the
Air swing
button and check the following:
X
5IFBJSøPXCMBEFTXPSLQSPQFSMZ
4. Press
the
Power
button to stop the operation.
2. Press
the
Mode
button to select Cool or Heat mode.
X
In Cool mode, use
Temp +
or
-
CVUUPOBOETFUUIFUFNQFSBUVSFBU¡$
X
In Heat mode, use
Temp
+
or
-
CVUUPOBOETFUUIFUFNQFSBUVSFBU¡$
$PPMJOHNPEF JOEPPSVOJUDIFDL*OMFUBJSUFNQ0VUMFUBJSUFNQ'SPN¡,UP¡, JOEJDBUJWFEFMUB5
)FBUJOHNPEF JOEPPSVOJUDIFDL
WW
0VUMFUBJSUFNQ*OMFUBJSUFNQ'SPN¡,UP¡, JOEJDBUJWFEFMUB5
In heating mode, the indoor fan motor can remain off to avoid cold air blown into conditioned space.
Pump down procedure (when removing the product)
t "QQSPYJNBUFMZ_NJOVUFTMBUFSPVUEPPSVOJUXJMMTUBSUUPPQFSBUFBOEUIF$PPMPS8BSNBJSXJMMCMPXPVU
t "GUFSNJOVUFTPGTUBUJPOBSZDPOEJUJPODIFDLUIFJOEPPSVOJUBJSUSFBUNFOU
t 8IFOZPVDPNQMFUFUIFJOTUBMMBUJPOTVDDFTTGVMMZIBOEPWFSUIJTNBOVBMUPUIFVTFSGPSTUPSBHFJOBIBOEZBOETBGF
place.
Summary of Contents for AC444FBRDEH
Page 1: ......
Page 21: ...21 ENGLISH Memo ...
Page 22: ... EEE Yönetmeliğine Uygundur This EEE is compliant with RoHS ...