24
EB 8111/8112 EN
Measures
Fig. 8:
Lifting points on the control valve
Lifting the control valve
1. Attach one sling to each flange of the
body and to the rigging equipment (e.g.
hook) of the crane or forklift (see Fig. 8).
2. Carefully lift the control valve. Check
whether the lifting equipment and acces
-
sories can bear the weight.
3. Move the control valve at an even pace
to the site of installation.
4. Install the valve into the pipeline (see sec
-
tion 5.2.3).
5. After installation in the pipeline, check
whether the flanges are bolted tight and
the valve in the pipeline holds.
6. Remove slings.
We recommend using a hook with safety
latch (see Fig. 8). The safety latch prevents
the slings from slipping during lifting and
transporting.
Tip
Summary of Contents for 3321
Page 11: ...EB 8111 8112 EN 11 Safety instructions and measures...
Page 27: ...EB 8111 8112 EN 27 Measures...
Page 33: ...EB 8111 8112 EN 33 Mounting and start up...
Page 35: ...EB 8111 8112 EN 35 Operation...
Page 45: ...EB 8111 8112 EN 45 Servicing...
Page 53: ...EB 8111 8112 EN 53...
Page 55: ...EB 8111 8112 EN 55 15 11 12 16 2 5 1 4 13 17 14 63 62 5 2 8 Type 3321 DN 65 to 100 NPS 2 to 4...