H10
www.samon.nl - [email protected]
V2-2016-ENG
20
3.
Move the joystick upwards to fold
out the upper section of the
conveyor belt.
The conveyor belt is folded in as follows.
1.
Set the remote control's selection
switch to operation of the
conveyor belt.
2.
Move the joystick downwards to
fold in the upper section of the
conveyor belt.
3.
Move the joystick to the right to
fold in the lower section of the
conveyor belt.
5.6.2
Operating the conveyor belt
WARNING!!!
Make sure that the conveyor belt is folded out completely before starting the conveyor belt.
Starting the conveyor belt while it is still folded in will damage the SAMON Onion Loader.
Set the remote control's selection
switch to operation of the
conveyor belt to start the
conveyor belt.
Summary of Contents for SU1L
Page 20: ...H18 www samon nl info samon nl V2 2016 ENG 20 9 2 Hydraulic diagram of hydraulic cylinders...
Page 21: ...H19 www samon nl info samon nl V2 2016 ENG 20 9 3 Electric diagram for remote control...
Page 22: ...H20 www samon nl info samon nl V2 2016 ENG 20 9 4 Electric diagram for main cabinet...
Page 26: ...Spare Parts List...