6.2. Preventive maintenance plan - See PMP 7161
The objective of the proposed preventive maintenance plan is to define in an exhaustive way, the verification,
replacement and cleaning actions of the installed
Sames
equipment.
In order to anticipate breakdowns and malfunctions that may be due to technical deviations of the installation, the
preventive maintenance plan attached to the user manual lists the routine maintenance operations necessary for
better comfort in the use of the production tool.
Depending on the skills, area of responsibility and accreditation of each person involved, the preventive maintenance
plan can be divided into two distinct levels: level 1 and level 2:
•
Level 1
: first level maintenance is essentially composed of visual control and cleaning operations of some
elements of the equipment. To limit this level, only the specific tools supplied with the equipment will be used.
This first level of maintenance is generally taken care of by paint operators or installation managers.
•
Level 2
: second level maintenance completes the first level by more complex dismantling operations requiring
electrical engineering tools.
This second level is generally handled by the factory maintenance department.
6.3. Cleaning
6.3.1. Procedure A: Cleaning the cart
Before any intervention, refer to the health and safety instructions (
Always wear safety glasses.
When handling powder, wear gloves of a suitable resistant material
Work in a well ventilated area.
All cleaning operations should only be carried out using compressed air at a maximum pressure
of 2.5 bar, a cloth or possibly a brush.
Never use water or solvents to clean the equipment.
• Clean the complete
Inocart
cart with compressed air every 8 hours.