
Doc.-ID: 210212-PT10BA-ES-RoughCam IPP1275_en_rev.00.docx, Page 12 of 20
Table 6-2 Pin assignment of the RJ12 plug (SKD04-T.flex)
It is necessary to make sure that the cable shield is grounded on side of the terminal block
!
Attention!
Finally, check your network installation with a Class-D Link Test.
Particularly in EMC critical environments, it is necessary to make sure that the cable shield is
grounded on side of the terminal block
!
The maximum cable length between camera and terminal box is 25 m.
5.2.3
Tests prior to switching on voltage
Attention!
Prior to starting the device, perform all tests as indicated by the na-
tional regulations. Furthermore, check the correct function and instal-
lation of the device in accordance with this User Manual and other ap-
plicable regulations.
Attention!
Incorrect installation or operation of the camera may lead to a loss of
warranty!
Attention!
Do not switch on the camera at temperatures below 0°C!