![Salus SunCube Owner'S Manual Download Page 35](http://html1.mh-extra.com/html/salus/suncube/suncube_owners-manual_4617924035.webp)
SUN_IS_ electrical_installation_v5.1_06092021
34
4. Connect the siren, SOS button, and LED light supply analogously to the HUUM installation
– see section XIV points A, B, and C.
XV.
FINAL TEST OF THE ELECTRICAL INSTALLATION CONNECTIONS
1. Screw on the furnace wire terminals "5" for voltage test purposes.
2. Connect the 400 V power (test) wire to the wiring in the box.
NOTE:
Make sure there is no current flowing in the wire before connecting.
3. Screw the wires into the junction box. Switch on the power supply.
Summary of Contents for SunCube
Page 1: ...OWNER S MANUAL Salus SunCube Sauna...
Page 2: ......