ESDB-GUIDE-ENG- 02-21
www.saltosystems.com
SALTO Systems - Universal Energy Saver manual
24
CONFIDENTIAL - This document contains confidential and privileged information.
The reproduction of any part of the document is strictly prohibited without the prior written consent of SALTO Systems S.L.
2.1 Dimensions
The location of and distance between the back cover mounting points are indicated in
the picture below.
2.2
Installation process
Installation of the surface mounted motion detector should follow the following steps:
Synchronization of the Surface Mounted Motion Detector with Energy Saver:
1. Present the Detector Synchronization Card to the Energy Saver, and hold it
on then press the CLR button inside the motion detector.
The Surface Mounted Motion Detector and the Energy Saver will now try to
find each other and synchronize. The synchronization has been completed
correctly when the red light flashes for approximately five seconds and then
goes off.
2. Repeat this process with all the Surface Mounted Motion Detectors that will
be used in the room.
Please note that the same Detector Synchronization Card can be used to
synchronize other Surface Mounted Motion Detectors with other Energy
Savers that will be located in other rooms.
Physical installation of Surface Mounted Motion Detector:
1. Mark two holes on the ceiling, 35 mm apart.
2. Drill the two holes using a M5 drillbit.
3. Fit the anchors in the drilled holes.
4. Separate the front cover from the back cover of the device, by turning the
back cover slightly counter-clockwise.
5. Fix the back cover to the ceiling using the 2 supplied nº 5 screws.
6. Place the front cover to the back cover, and then turn the front cover clockwi-
se slightly so that the two halves are joined. Then fix with the remaining fixing
screw in one of the three holes provided
35mm