Light Commercial R410A on-off
S13-01.01.13en
5.3 Drainage pipe insulation
The connection part should be insulated, or else water will be condensing at the non-insulation part.
5.4 Note
5.4.1 The jointing area, expanding area and the flange area should be heat insulated after passing
the pressure test
5.4.2 The gas and liquid pipe should be heat insulated individually, the connecting part should be
heat insulated individually.
5.4.3 Use the attached heat-insulation material to insulate the pipe connections
(pipes’ tie-in ,expand nut )
of the indoor unit
Installation
116
Summary of Contents for SOB-50VA
Page 1: ...S13 01 01 13en Light Commercial Air Conditioner R410A ON OFF Service Manual 2013...
Page 6: ...Light Commercial R410A on off S13 01 01 13en 2 2 Outdoor Units General Information 5...
Page 48: ...Light Commercial R410A on off S13 01 01 13en 4 Service Space Indoor Units Ceiling Floor 47...
Page 62: ...Light Commercial R410A on off S13 01 01 13en SIB 50TAV SIB 60TAV Indoor Units Ceiling Floor 61...
Page 68: ...Light Commercial R410A on off S13 01 01 13en 3 Dimensions Indoor Units HSP Duct Type 67...
Page 69: ...Light Commercial R410A on off S13 01 01 13en Indoor Units HSP Duct Type 68...
Page 91: ...Light Commercial R410A on off S13 01 01 13en 5 Wiring Diagrams SOB 50VA Outdoor Units 90...
Page 92: ...Light Commercial R410A on off S13 01 01 13en SOB 60VA SOB 100YA Outdoor Units 91...
Page 93: ...Light Commercial R410A on off S13 01 01 13en SOB 140YA SOB 200YA Outdoor Units 92...