6-024
DRUMS
4-2. Reassembly of Drums
4-2-1. Front drum
• Before reassembling, clean disassembled parts well
and check that there is no abnormality.
•
When standing the vibratory drum, use
wooden blocks of sufficient strength to
securely support the drum.
•
Carry out the work in an unstrained posture
using a work stool or the like.
1) Stand drum (1) with its propulsion motor side facing
up.
Drum : 225 kg (496 lbs.)
NOTE : Propulsion motor side dimension
“
a
”
:
320m (12.5 in. ).
CR271-06049
1
a
2) Apply a coat of gear oil to hub (22) at where
bearing will be press-fitted.
• Drive in vibrator bearing (6).
NOTE : Take care not to damage the bearing
when installing it.
CR271-06050
22
6
3) Reverse hub SUB ASSY and lower hub SUB ASSY
on mounting surface of drum (1)..
Hub SUB ASSY : 10 kg (22 lbs.)
CR271-06051
Hub SUB ASSY
1
Summary of Contents for CR271
Page 1: ...CR271 SHOP MANUAL 3498 65634 0 ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 11: ...SAFETY ...
Page 12: ......
Page 20: ......
Page 21: ...SPECIFICATIONS ...
Page 22: ......
Page 23: ......
Page 30: ......
Page 31: ...ENGINE AND CONTROLS ...
Page 32: ......
Page 38: ......
Page 39: ...HYDRAULIC SYSTEMS ...
Page 40: ......
Page 41: ......
Page 47: ......
Page 58: ......
Page 59: ...ELECTRICAL SYSTEM ...
Page 60: ......
Page 65: ......
Page 70: ......
Page 71: ...DRUMS ...
Page 72: ......
Page 77: ...6 005 DRUMS 7 Remove drum assembly together with bracket from frame CR271 06007 ...
Page 95: ...6 023 DRUMS 13 Remove side plate SUB ASSY Side plate SUB ASSY 20 kg 44 lbs CR271 06048 ...
Page 114: ......
Page 115: ...PARKING BRAKE ...
Page 116: ......
Page 118: ......
Page 119: ...WATER SPRAY SYSTEM ...
Page 120: ......
Page 121: ......
Page 124: ......
Page 125: ...INSPECTION AND ADJUSTMENT ...
Page 126: ......
Page 140: ......
Page 141: ...TROUBLESHOOTING ...
Page 142: ......
Page 153: ......