3 SERVICE
RE2100
SSB MODE
1.
Connect the generator to the aerial socket at the front end unit (module 2).
2.
Connect the voltmeter to testpoint TP1-1 for measuring the DC voltage at the level detector output.
3.
Connect the counter to earpiece output at testpoint TP2-1.
4.
Turn the RE2100 on.
5.
Turn the RF gain control fully clockwise and make sure that the AGC is operative.
6.
Choose generator frequency f
G
, generator output level V
G
and receiver frequency f
RX
according to
the table in point 20.
7.
Make sure that J3E mode (SSB) is selected and that the AF signal frequency is approx. 1 kHz.
8.
Wait 15 min. before proceeding, to temperature stabilize the receiver.
9.
Turn off the AGC and adjust the manual RF GAIN Control to achieve a voltage of about 5 volt at
testpoint TP1-1.
10.
Finetune the receiver frequency by means of the arrow keys until maximum meter deflection, when
measuring at testpoint TP1-1.
11.
Readjust the manual RF GAIN to achieve a voltage of 5 volt at testpoint TP1-1.
12.
To measure the 6 dB bandwidth, increase V
G
by 6 dB and notice that the measured voltage will
increase to about 14 Volt.
13.
Increase the receiver by means of the upward arrow key until the voltage at testpoint TP1-1 is just
about 5V.
14.
Activate the clarifier function by pressing the <CLARIF> key and finetune the receiver frequency
with the arrow keys until the voltage measured at testpoint TP1-1 is just above 5 volt. Now notice
the receiver frequency in the display.
15.
Deactivate the clarifier function by pressing the <CLARIF> key and decrease the receiver
frequency by means of the downward arrow key until the measured voltage is just about 5 volt.
16.
Key-in point 14.
17.
Calculate the difference between the two frequencies found in points 14 and 16. This difference
is equal to the 6 dB bandwidth, which must be above 2550 Hz.
18.
To check the stopband attenuation, increase generator output level V
G
by 20 dB relative to V
G
in
point 20.
19.
Key-in the frequencies 1987.7 kHz and 1991.2 kHz and remember to turn off the AGC in each case.
Control in both cases the DC voltage at testpoint TP1-1 to be below 5 volt.
20.
PAGE 3-24
Summary of Contents for RE2100
Page 1: ...S P RADIO A S AALBORG DENMARK TECHNICAL MANUAL FOR COMPACT HF SSB RE2100...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 35: ...3 SERVICE RE2100 PAGE 3 5 DIAGRAM TESTBOX...
Page 94: ......
Page 98: ......
Page 100: ......
Page 108: ...PAGE 5 8 5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100...
Page 112: ...PAGE 5 12 5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100...
Page 122: ...PAGE 5 22 5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100...
Page 125: ...PAGE 5 25 5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100...
Page 128: ...5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100 PAGE 5 28...
Page 131: ...5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100 PAGE 5 31...
Page 134: ...PAGE 5 34 5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100...
Page 136: ...PAGE 5 36 5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100...
Page 140: ...5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100 PAGE 5 40...
Page 144: ...PAGE 5 44 5 CIRCUIT DESCRIPTION AND SCHEMATIC DIAGRAMS RE2100...
Page 148: ......
Page 155: ...RE2100 CONTENTS 7 PARTS LIST...
Page 156: ......