= Inspect
= Verify
= Perform process
Document No: 723590-1
Revision: D
Issue Date: 2023-Jan-30
Page 29 of 45
This document and all copies are the property of Safeworks, LLC. All dimensions and data are indicative only.
The user must ensure that the equipment complies with local rules and regulations.
9.2 Testing the Overspeed Brake Test Button
Push in the
UP Operation Button
and raise the platform approximately
3 feet (1 meter).
Remove the Emergency Descent Lever
from the storage location and insert into brake
through the cutout on motor body.
Lift the Emergency Descent Lever. As the
hoist begins to descend, push the Overspeed
Test Button.
The hoist MUST stop IMMEDIATELY! The
DOWN button will light up
RED
RED
to indicate
the overspeed brake has activated and the
DOWN circuit has been interrupted.
Emergency
Descent Lever
Overspeed Brake
Test Button
UP Operation
Button
Figure: 9.2.1
9.3 Resetting the Overspeed Brake Test Button