
= Inspect
= Verify
= Perform process
Document No: 723590-1
Revision: D
Issue Date: 2023-Jan-30
Page 23 of 45
This document and all copies are the property of Safeworks, LLC. All dimensions and data are indicative only.
The user must ensure that the equipment complies with local rules and regulations.
7. HOIST SETUP
7.1 Installing Hoist onto Platform
Follow the manufacturer’s instructions for platform assembly.
The hoist can be lifted into position by hand or under power.
Attach the hoist stirrup bar to the platform stirrup.
Connect the hoist to the power supply. Spider
®
battery hoists have a push & lock plug.
The power indicator light will come on when the hoist receives power and the emergency
stop is not depressed.
7.2 Reeving Primary Suspension Wire Rope
Push the primary suspension wire
rope through the wire rope insertion point
approximately 15 inches.
Primary Suspension Wire
Rope Insertion Point
Figure: 7.2.1
Operate the hoist in the
UP direction while
pushing the rope into the hoist.
Ensure the wire rope runs freely through
the wire rope exit guide.