background image

Figure 4.  Checking the State

Figure 5.  Refreshing charge

Table F6.  Node ID#

Figure 6.  Manual Node ID setting (ID # from 1 to 4)

Figure 4 Steps

 (refer to illustration and tools)

1

 Press ON/OFF button for 2 seconds and allow the self-test 

to complete. Record the Operating LED state (see Table 3).

CAUTION:

 When ON, the battery voltage is connected to the 

power terminals.

2

 Press the SOC/SOH button (See Table 2).

3

 Observe and note the LED state for SOC and SOH (See 

Table 2).

4

 Remove cover and measure and note the terminal 

voltage. Replace cover.

5

 Press ON/OFF button for 4 seconds to turn OFF the Evolion

®

.

The Evolion

®

 is now ready for continued storage or service.

Figure 5 Steps

1

 Connect the power terminals to a telecom rectifier 

according to Figure 8.

NOTE:

 If the voltage is within 0.5 V between the modules, 

paralleling and charging more than one module is OK. See 
Figure 4 to check module voltage.

2

 Before applying power, set the rectifier output voltage 

according the Table F5 and the maximum output current 
to 21 Amps per Evolion

®

.

3

 Power ON and start charging according to Figure 10.

4

 Continue charging for the minimum amount of time 

according to Table F5.

5

 Turn OFF the rectifier output power and then turn OFF 

the Evolion

®

.

The Evolion

®

 is now ready for continued storage or service.

Figure 6 Steps

 (refer to illustration and tools)

CAUTION:

 Make sure to disconnect the power cables before 

conducting these steps.

Table F5. Charging guide

LED

ID#

1

2

3

4

> 4

(Note 1)

To set %SOC

Max. V  

set-point

Chg hours  

(Note 1)

45% (1 year more storage)

50.5 V ±1.0%

2.5

100% (to put in service)

56.0 V ±1.0%

4.5

1

 Turn OFF the Evolion

®

2

 Press and hold the SOC/

SOH button and ON/OFF 
button simultaneously for  
2 seconds.

3

 The current Node ID will be 

displayed. See Table F6.

4

 To change the Node ID, 

press the SOC/SOH button 
until the LED indicates a 
Node ID between 1 and 4.  
See Table F6.

5

 Press the ON/OFF button 

for 4 seconds to turn OFF; 
the new Node ID is now set.

6

 Scribe the Node ID on the 

outside in a visible location.

The Evolion

®

 is now ready for continued storage or service.

Note 1:  Based on 21 Amps per Evolion

®

 and 0% SOC at the start of charge.

Note 1: To set a Node ID higher 

than 4, use the Evolion

®

 

Toolbox Software. 

Figure 8.  Connections

Figure 8 Steps

 (refer to illustration and tools)

CAUTION:

 Do not conduct these steps if any Evolion

®

 has more 

than 2 V difference. The fuse or power board may be overloaded.

IMPORTANT:

 Make sure all Evolion

®

 modules are OFF before starting.

1

 Make sure the rectifier battery output breakers are open 

or disconnected so the power bus is not live with power.

IMPORTANT:

 Never turn the Evolion

®

 ON using the ON/OFF 

button once the power cables are connected to the power 
bus to avoid breaking a fuse due to pre-charging a capacitor.

IMPORTANT:

 Never connect the Evolion

®

 in series.

2

 Remove the front cover and connect all the Evolion

®

 power 

cables provided (772516, 772517). Replace the front 
cover after torqueing the terminals.

NOTE:

 The recommended terminal torque is 6 N-m  

(53 in-lbs) unless otherwise noted on the Evolion

®

.

NOTE:

 Either power terminal can connect and operate on 

a Common Bonding Network (CBN) or an Isolated Bonding 
Network (IBN).

3

 Connect all communication cables provided (772518) 

between each Evolion

®

.

4

 Connect the RJ45 resistor cap provided (773455).

5

 Connect all grounding points on the heat sink face.

NOTE:

 It is not necessary to ground the heat sink face to function.

The Evolion

®

 modules are now ready to connect communication 

according to Figure 9 and Power ON according to Figure 10

.

SHUTDOWN procedure:

a

 Open the output breaker (1)

b

 Turn OFF each Evolion

®

 using the ON/OFF button.

c

 Disconnect cables.

Reviews: