background image

Ev5:
Sizing is correct?

Ev6:
∆V ≤ 2V

a

?

Ev7:
Node ID# set?

Ev8:
Terminal torque OK?

Ev9:
Op. LED’s state

b

?

 
Installation Date

#

a

 This check is required if more than one Evolion

®

 will be installed and operated on one bus.

b

 See Table 3

INSTALLATION NOTES:

Module Label:

Installation Checklist:

Evolion

® 

3.9 kWh

Historical Data Sheet

P/N

S/N

Manufacturing Date

Software Version

Parameters Version

Date

Initials

Node ID#

a

RS_speed

b

Factorized IMR

b

Parameter (btr)

b

BMST upgrade

b

a

 See Figure 6 or use the Evolion

®

 Toolbox Software.

b

 Use the Evolion

®

 Toolbox Software.

Ev1: All items received (Table 1)?

Ev3: Use Figure 4 and log the following information:

Month Date

Op. LED state
(Table 3)

Terminal Voltage
(xx.x)

SOC LED state
(Table 2)

SOH LED state
(Table 2)

1

2

3

4

5

6

7

8

9

10

11

12

Receiving and Storage:

Reviews: