Before our machines are delivered they pass a tight quality control in the works
Given that we no longer have a bearing on the machine after it leaves the works, the dealer has to perform
another check before the delivery to the end customer
The following is to be checked
Exterior damages produced by transport etc
Tight seat of all screw and hose connections
Complete functional control of all parts
This control is to be confirmed with stamp and signature on the
Machine Delivery Document
If the fully
completed and signed delivery document is not returned there is no right for warranty
Furthermore, it is required to check all screw connections for tight seat and the laid hoses for marks of
abrasion
Agree a date for this directly with your customer
Regular inspections according to the operating manual are to be met
Controlled quality – an important step towards customer satisfaction!
Play your part
Summary of Contents for GS/PUMA 35D
Page 1: ......
Page 2: ......
Page 3: ......
Page 28: ...nuts...
Page 29: ......
Page 30: ......
Page 36: ......
Page 37: ...slightly tensioned Correctly retighten locknut...
Page 38: ......
Page 50: ......
Page 52: ......
Page 54: ...1...
Page 57: ...Specifications...
Page 58: ......
Page 59: ...PUMA 120 bar Hydraulic Circuit Diagram Infeed roller Con veyor Backwards Forwards...
Page 64: ......