INDEX
1 -
PREMISE ..................................... 4
1.1
User instructions ......................... 4
1.2
General instructions .................... 4
2 -
TECHNICAL SPECIFICATIONS ..... 6
3 -
GENERAL TECHNICAL
DESCRIPTION ............................ 7
3.1
Machine description .................... 7
3.2
Use allowed................................ 7
3.3
Models ....................................... 7
3.4
Basic operation concepts ............. 8
4 -
VENDING MACHINE
HANDLING ................................ 11
4.1
Handling and transport ............... 11
4.2
Stocking ..................................... 12
4.3
Packing ...................................... 12
4.4
Reception ................................... 12
4.5
Unpacking .................................. 13
5 -
SAFETY STANDARDS ................... 14
6 -
INSTALLATION ........................... 15
6.1
Positioning .................................. 15
6.2
Water mains connection .............. 16
6.3
Electric Mains connection ............. 17
6.4
Machine starting up.................... 18
6.5
Installation .................................. 19
6.5.1 Regeneration of water softener
resins (available as a kit) ............. 19
6.5.2 Water circuit filling ...................... 20
6.5.3 Cleaning the parts in contact
with foodstuff .............................. 22
6.6
Product loading .......................... 23
6.6.1 Container loading ....................... 23
6.6.2 Label insertion ............................ 24
6.6.3 Cup loading ............................... 24
6.6.4 Spoon loading ............................ 25
6.6.5 Coffee-grounds bag insertion ...... 26
6.6.6 Payment system installation .......... 27
7 -
PROGRAMMING ........................ 28
7.1
Function description .................... 32
8 -
SERVICE ..................................... 40
9 -
MAINTENANCE AND
INACTIVITY ................................ 41
9.1
Cleaning and Loading ................ 41
9.1.1 Daily cleaning ............................. 41
9.1.2 Weekly cleaning .......................... 42
9.1.3 Product loading .......................... 43
9.2
Maintenance ............................... 43
9.2.1 Ordinary and extraordinary
maintenance ............................... 44
9.2.2 Coffee group maintenance .......... 44
9.3
Regulations ................................. 45
9.3.1 Dosage and grinding regulations . 45
9.3.2 Instant electric valve capacity
regulation (only for double boiler
models) ...................................... 45
9.4
Resin regeneration (where the
water softener is provided) ........... 46
9.5
Inactivity ..................................... 47
10 - DISMANTLING ........................... 48
11 - TROUBLESHOOTING GUIDE
FOR THE MOST COMMON
FAILURES OR ERRORS ................. 49
Summary of Contents for GROUP 700
Page 52: ...Inglese 52 ...
Page 53: ...53 Inglese Notes ...
Page 54: ...Inglese 54 Notes ...
Page 55: ...55 Inglese Notes ...
Page 56: ...Cod 0871 956 ...