Engineering manual - SAB 193-233-283 S A-frame (including ATEX)
008831 en 2022.02
107/175
2.
Check that all access roads are wide enough for the unit to pass, see the dimension
sketches.
3.
Block the mounting site. The site must be blocked to prevent unauthorised personnel
from being injured or causing damage.
4.
Clear the mounting site.
7.12
Space requirements
When installing the unit, make sure that the plant can be serviced without problems, i.e. always
make sure that there is enough space around the plant. See subsection
.
7.13
Lifting and loading instructions
See chapter
.
7.14
Unpacking and inspection
See chapter
.
7.15
Disposal of non-reusable materials
Materials from the unit packing which cannot be reused must be disposed of according to local
regulations.
7.16
Moving the equipment to the mounting site
After unloading and unpacking
See chapter
.