84
English
5
6
7
1
2
3
Main Board
CONTROL T-EP
DL1
PWM
PE
PE
PE
N
L
L1
L2
+
-
F3
M1
M3
M2
M4
M17
M16
FAN1
FAN2
F2
F1
FC
FC
C3
C3
C1
C1
DY1
KP3
KP2
KP1
IAQ
KNX
RS485-B
RS485-A
T-EP
MC4
M5
MC3
MC5
M15
+12
D+
D-
0
M14
D+
D-
0
3
4
6
7
5
M7
M8
M6
M13
M12
M9
T2
T3
T4
T1
DL1
F
F1
F2
FAN2
FAN1
N - L
PE
EH
EH1
C1-C1
C3-C3
FC-FC
MC4
IAQ
PE
MOTOR
KNX
RS485-B
T-EP REMOTE CONTROL
(OPTIONAL ACCESSORY)
Connecting the remote control T-EP
Take the remote display controller (OPTIONAL ACCESSORY)
and connect it electrically as described below.
Use a 3x0.5 mm
2
cable.
The maximum cable length between the unit and the dis-
play controller must not exceed 20 metres.
ATTENTION!: you are recommended to use a cable gland
of PG7 type or fairled to keep the mechanical seal of the
input cable.
a) connect the cable to connector “
T-EP (terminals no. 7-6-5)
”
of the power board via the cable gland;
b) fix the cable in the cable gland;
c) connect the cable to terminals 1-2-3 on the controller,
following the sequence of numbers.
MAIN BOARD
TERMINAL
T-EP
T-EP CONTROL
TERMINAL
7
3
6
2
5
1
Summary of Contents for Energy SHP-130
Page 29: ...29 Italiano Installazione del comando a muro 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 ...
Page 59: ...59 Italiano ...
Page 85: ...85 English 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 Installing controller on the wall ...
Page 115: ...115 English ...
Page 141: ...141 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 Français Installation de la commande au mur ...
Page 171: ...171 Français ...
Page 197: ...197 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 Español Instalación del mando en la pared ...
Page 227: ...227 Español ...