STEP 8: FINAL SLIDE POSITION - Continued
TIPS FOR SETTING THE SLIDE IN FINAL POSITION -
Continued
• Now, put exit section is in its correct horizontal and vertical position relative to the pool edge by adjusting
the blocks.
• Then, start at the top of the slide and work down using an angle finder along the center of the flume, adjust
the blocks to achieve the correct angle for the flume.
• Once the angle for the flume is set correctly, re-check the position of the exit section for alignment and height
above water, adjust as necessary.
• Then, start at the top of the slide and work down, adjust the blocking materials to level the flume from side
to side.
• Once the flume is level from side to side, re-check the position of exit section for alignment and height above
water, adjust as necessary.
• Repeat this process until the entire slide is correctly positioned.
STEP 9: POUR CONCRETE PIERS
Once the correct horizontal and vertical position of the slide has been established and verified, pour the
concrete around anchor supports and allow to cure.
STEP 10: CONNECT WATER SUPPLY SYSTEM
The BYOS 2 slide can be plumbed with rigid 1” PVC pipe or with 1” Flex PVC, you may find that Flex PVC
works best.
Glue and slip pipe into the 1” female fittings on the underside of the Entry section. (Fig. 23 & 24) Use PVC primer
and glue (not included) as required.
The BYOS 2 has two water delivery units. A ball is valve recommended on each side to evenly adjust the water flow.
FIG. 23
FIG. 24