Digging the Hole
•
Position the machine over the
desired hole replacement area.
Extending boom 12 or 14
inches and allowing enough
slack in rope to drill a straight
hole down.
•
Turn on the remote and toggle
the Auger switch to the correct
direction then lower the auger
to begin digging.
•
NOTE:
It may be required to
lower the auger speed to allow
for booming down of the digger
derrick while digging.
•
CAUTION: Buried lines may
be in your digging area.
Summary of Contents for EZ Hauler 4100
Page 1: ...EZ Hauler 4100 Training Procedure Manual...
Page 4: ...Hard hats and protective gear must be worn by all personnel when using the EZ Hauler 4100...
Page 9: ...Pre trip Inspection Check all tires on the EZ Hauler 4100 trailer for wear proper inflation...
Page 12: ...Pre trip Inspection Turn on the remote control check the function of all controls...
Page 29: ...Auger Operation Procedure...
Page 41: ...Bucket Assembly Standard Operating Procedure...
Page 45: ...Shows the bucket mount installed and pinned it in place...
Page 46: ...The bucket can now be mounted to either side of the mount to best accommodate working from it...
Page 49: ...Hydraulic Pole Guide Procedure...
Page 50: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...