The EZ Hauler 3800 / 4100 series of machines are all
dielectrically tested to 46kv category “C” guidelines. This
qualification test is performed at the factory in
accordance with ANSI A10.31 guidelines.
It is important that periodic tests be performed to the EZ
Hauler just as any other digger-derrick in a companies
fleet.
Weight of load must be known at all times . Boom capacity
at any angle should never be exceeded. Please follow
the weight scale posted on each EZ Hauler for weight
capacity.
IMPORTANT!
Summary of Contents for EZ Hauler 4100
Page 1: ...EZ Hauler 4100 Training Procedure Manual...
Page 4: ...Hard hats and protective gear must be worn by all personnel when using the EZ Hauler 4100...
Page 9: ...Pre trip Inspection Check all tires on the EZ Hauler 4100 trailer for wear proper inflation...
Page 12: ...Pre trip Inspection Turn on the remote control check the function of all controls...
Page 29: ...Auger Operation Procedure...
Page 41: ...Bucket Assembly Standard Operating Procedure...
Page 45: ...Shows the bucket mount installed and pinned it in place...
Page 46: ...The bucket can now be mounted to either side of the mount to best accommodate working from it...
Page 49: ...Hydraulic Pole Guide Procedure...
Page 50: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...