Moving a pole:
Lifting and carrying a pole can be performed easily with the
hydraulic outriggers.
Moving the EZ Hauler 4100
With a Load
Attach the provided lifting chains
to the pole and to the d-rings on
the EZ Hauler 4100 outrigger
arms as shown.
(Picture may not be a true representation of your machine.)
Summary of Contents for EZ Hauler 4100
Page 1: ...EZ Hauler 4100 Training Procedure Manual...
Page 4: ...Hard hats and protective gear must be worn by all personnel when using the EZ Hauler 4100...
Page 9: ...Pre trip Inspection Check all tires on the EZ Hauler 4100 trailer for wear proper inflation...
Page 12: ...Pre trip Inspection Turn on the remote control check the function of all controls...
Page 29: ...Auger Operation Procedure...
Page 41: ...Bucket Assembly Standard Operating Procedure...
Page 45: ...Shows the bucket mount installed and pinned it in place...
Page 46: ...The bucket can now be mounted to either side of the mount to best accommodate working from it...
Page 49: ...Hydraulic Pole Guide Procedure...
Page 50: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...