Setting a Pole With the
EZ Hauler 4100
• Remember the EZ Hauler
4100 is
not totally
electrically insulated.
Use your company’s
insulation procedure to
avoid electrocution.
Before setting a pole the
load capacity chart must
be thoroughly
understood.
Caution!!
Weight of load must be known at all
times . Boom capacity at any angle should never be
exceeded.
Summary of Contents for EZ Hauler 4100
Page 1: ...EZ Hauler 4100 Training Procedure Manual...
Page 4: ...Hard hats and protective gear must be worn by all personnel when using the EZ Hauler 4100...
Page 9: ...Pre trip Inspection Check all tires on the EZ Hauler 4100 trailer for wear proper inflation...
Page 12: ...Pre trip Inspection Turn on the remote control check the function of all controls...
Page 29: ...Auger Operation Procedure...
Page 41: ...Bucket Assembly Standard Operating Procedure...
Page 45: ...Shows the bucket mount installed and pinned it in place...
Page 46: ...The bucket can now be mounted to either side of the mount to best accommodate working from it...
Page 49: ...Hydraulic Pole Guide Procedure...
Page 50: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...