
11. Shoe Control Arm Installation and Adjustment
Type 1:
Install the shoe control arm through the guide hole (handle end first)
Adjust the length of the control arm by threading the
lower half of the arm into the upper half. The final
length of the arm should allow the drip guard to fully
cover the bottom of the transfer tube when the shoe is
in the raised position (shown to the right). Once the
final length is set tighten the adjustment nut.
Summary of Contents for RA-MLT-0005
Page 3: ......
Page 9: ...3 Handle Bar Assembly KIT F Handle Bar Assembly RK FAS 0001 KIT E Handle Bar Mount RK FAS 0002...
Page 10: ...4 Agitation Sweep Bar Installation KIT K Agitation Sweep Bar RK FAS 0006...
Page 12: ...6 On the Fly Agitation Installation KIT J Agitation Bars RK FAS 0005...
Page 14: ...9 Shoe Installation KIT I Shoe Mount RK FAS 0027...
Page 24: ...19 Heat Shield Installation KIT G Heat Shield RK FAS 0010...
Page 25: ...20 Propane Hose Connection Connect the regulator to the propane cylinder and hand tighten...