8. Commissioning / Operation
Fill the liquid directly into the liquid
container.
Use the viewing panel to monitor the
level of the liquid.
Use the viewing panel to monitor the
level of the liquid.
15
8.3 Filling with liquid / topping up
8.3.1 Filling with liquid
8.3.2 Topping up with liquid
8.4. Checking the function of the degasification valve
The degasification valve should always
be checked for correct operation
before commissioning and each time
before starting the wet separator.
Ensure that the machine is switched
off before carrying out this check. The
valve head should slot into place with
gentle pressure and automatically
return to its original position with the
help of the spring.
Fill the liquid directly into the liquid
container
OPTIONAL:
If the NA 7-11 if equipped with a warn-
ing light, this will light up to indicate a
low liquid level in the wet separator.
The vacuum unit will then shut down
automatically.