Rugged Interactive
Unit 1, Callywith Court
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
WallRider
–
Section 2 - Installation
© Rugged Interactive
2019
3.3 - Installation Overview
Below is an overview of the steps needed to install WallRider. More detail for the process is
provided in the following pages. Please read through ALL of this prior to beginning the installation
and if you are in any doubt, contact Rugged Interactive.
If you have any concerns on how or what the product is installed to, contact a structural engineer
prior to beginning the installation.
STEP 1:
Mark out recesses for eight targets and one scorebox.
STEP 2:
Cut recesses for eight targets and one scorebox.
STEP 3:
Mount scorebox.
STEP 4:
Run cables.
STEP 5:
Mount targets.
STEP 6:
Turn on WallRider system.
STEP 7:
Test.
STEP 8:
Check all is secured.
STEP 9:
Stress relief cables.
STEP 10:
Enjoy WallRider!