Rugged Interactive
Unit 1, Callywith Gate
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
WallRider
–
Section 2 - Installation
© Rugged Interactive
2019
Section 3 - Installation
3.1 - Parts List
Please check off the received parts for the installation and alert Rugged Interactive immediately i
f
anything is missing.
8 x Targets.
☐
1 x Hub display assembly.
☐
8 x 10m target connection cables.
☐
56 x M8 x 50mm Button socket fixing bolts.
☐
56 x M8 Nyloc nuts.
☐
56 x M8 Penny washers.
☐
Manual.
☐
3.2 - Tools and Components List
Arrange the necessary tools and the team to install the product.
Ladder.
☐
Spirit level
.
☐
Jigsaw.
☐
Industrial vacuum cleaner.
☐
Dustpan and brush.
☐
SDS impact drill.
☐
Cordless drill – with torque adjuster to avoid over-tightening the screws.
☐
A set of No.2 Pozi bits.
☐
A set of screwdrivers.
☐