background image

WallRider Order and Installation Manual:  

Programs Guide

 

 

 

WallRider 

 Section 5 - Programs Guide

 

© Rugged Interactive 

2019

 

 

 

Intermediate  

Summary: 

A clear out stamina and control building challenge moving the user between walls. 

 

Gameplay: 

All targets are active, and the objective is to clear all the illuminated targets, the 
game cycles through a sequence of all targets being illuminated, just the side 
walls, just the front wall then back to all being illuminated. This sequence repeats 
throughout the duration of the game. 

 

Aim: 

To clear as many illuminated pods as possible within the given time limit. 

 

Scoring system: 

+1 for the red target, +2 for the orange and yellow targets, +3 for the green target. 

 

Duration: 

1 minute 

 

 

NOTE: 

If at any time WallRider behaves unexpectedly during gameplay, wait for at least 60 seconds for the 

unit to reset to its idle state. 

 

 

 

Summary of Contents for WallRider

Page 1: ...r and Installation Manual For models from January 2019 onwards Rugged Interactive Unit 1 Callywith Court Callywith Industrial Estate Bodmin Cornwall UK PL231 2RQ 44 0 1726 981 123 www rugged interacti...

Page 2: ...er and Installation Checklist 1 3 Product Overview 1 4 Ordering and Installation Timeline 1 5 Getting Started 1 6 Place Order Section 2 Safety Guidelines 2 1 Installation Safety Guidelines 2 2 In Play...

Page 3: ...provide guidance only the installation of the Rugged Interactive product will be under your control You will be responsible for making sure upon completion of the installation it is safe to use As alw...

Page 4: ...ired for export customers Complete site survey Send purchase order or confirm order Make first payment Discuss graphic requirements and provide logos and branding guidelines Approve graphics Make seco...

Page 5: ...e Wall into a major attraction With three different game programs it is suitable for advanced users and beginners alike A standard WallRider consists of 8 x bulletproof target pads 1 x HUB display and...

Page 6: ...t request If further information is required please get in touch and we will be able to provide further information and guidance 1 6 Place Order Key Contacts at Rugged Interactive Commercial Director...

Page 7: ...ts weight and gameplay If possible avoid stud walls or unsupported portal infills If in doubt always contact a suitably qualified surveyor to check Visually check the product for any signs of damage c...

Page 8: ...er of staff immediately Ensure you familiarise yourself with any additional facility rules that may apply Ensure that the play area in front of the equipment is clear before attempting to participate...

Page 9: ...ather soles high heels sandals boots or bare feet No food drink or chewing gum during participation No phones or cameras in the activity area Do not leave clothing or personal belongings around the ac...

Page 10: ...n and alert Rugged Interactive immediately if anything is missing 8 x Targets 1 x Hub display assembly 8 x 10m target connection cables 56 x M8 x 50mm Button socket fixing bolts 56 x M8 Nyloc nuts 56...

Page 11: ...llowing pages Please read through ALL of this prior to beginning the installation and if you are in any doubt contact Rugged Interactive If you have any concerns on how or what the product is installe...

Page 12: ...imum required wall height 2m A 502mm x 242mm hole 3 0 will need to be cut from the plywood for each of the targets to be fitted A 502mm x 482mm hole 3 0 will need to be cut from the plywood for the sc...

Page 13: ...trampoline bed Take into consideration individual trampoline park primary user groups and the relative bounciness of trampolines when determining the installation height Minimum wall height 2m Please...

Page 14: ...Installation Rugged Interactive 2019 WallRider Installation 01 02 1 Mark out and cut the recesses for eight targets and one score box 2 Mount score box this contains eight hanging cables for the targe...

Page 15: ...ets should be positioned in a suitable location 8 If possible stress relief all cables every 50cm 7 Once all targets are connected correctly ensure they are fully secured NB Do not overtighten grip sc...

Page 16: ...al Installation WallRider Section 3 Installation Rugged Interactive 2019 Figure 3 4 1 A Possible WallRider Layout Figure 3 4 2 A Possible WallRider Layout Figure 3 4 3 A Possible WallRider Layout Figu...

Page 17: ...er installation heights Installation layout and heights are at the discretion of the installer Wall heights and primary user groups should be considered We recommend having the scorebox in a location...

Page 18: ...WallRider Order and Installation Manual Installation WallRider Section 3 Installation Rugged Interactive 2019 Figure 3 4 6 Typical WallRider Installation...

Page 19: ...allRider Section 4 How to Use Rugged Interactive 2019 Section 4 How to Use On power up WallRider will sound a laugh and will turn to its idle state WallRider has three programs 1 Beginner 1 minute 2 I...

Page 20: ...and coordination Gameplay Played on just the four targets located on the front wall The targets will illuminate one at a time and follow a sequence training the user s ability to move up and down the...

Page 21: ...cles through a sequence of all targets being illuminated just the side walls just the front wall then back to all being illuminated This sequence repeats throughout the duration of the game Aim To cle...

Page 22: ...arget will illuminate for the user to hit The sequence will move from a random target on the front wall to a random target on the side walls repeating this sequence throughout the game Aim To clear as...

Page 23: ...gle unit 600 x 75 x 340 5 kg WallRider Score Box single unit 600 x 75 x 580 6 kg Other Specifications Power Supply AC 110 230V 50 60Hz 13A Warranty 1 year on electronics 3 years on all other parts Reg...

Page 24: ...cations Rugged Interactive 2019 Cut out sizes Each target and the HUB Score box will require a recess cut out of the wall for them to sit flush to the wall Figure 1 Score box and target cut out size r...

Page 25: ...ifications Rugged Interactive 2019 Mounting Points and Dimensions Figure 2 Score box Mounting Points and Dimensions Dimensions in mm Figure 3 Target Mounting Points and Dimensions Dimensions in mm 25...

Page 26: ...and or pinched cables No loose cables that could become a tripping hazard All long cables are supported at least every 50 cm Adequate strain relief provided for connection points Kept out of direct s...

Page 27: ...down from 3 and begins Expected targets become active and operational in sequence Sounds can be heard when the targets are hit Program plays as described in the Programs Guide Check 6 Ready for use P...

Page 28: ...ay 4 If a pod has seven 7 or fewer working LEDs we recommend replacing the pod only applicable for CardioWalls 5 We suggest non solvent glass cleaning spray avoid spraying directly onto the pods Use a...

Page 29: ...WallRider Congratulations Rugged Interactive 2019 Congratulations Congratulations on your new Rugged Interactive product Your customers are going to love this and it is a great addition to your venue...

Reviews: