12
Ruckus ICX 7850 Switch Hardware Installation Guide
Part Number: 53-1005580-01
Preparing for Installation
Quick Installation Checklist
Quick Installation Checklist
This checklist provides a high-level overview of the basic installation process from the planning stage to the point where the device comes
online and is ready to be deployed. Completing all the tasks in the suggested order ensures successful installation. Ruckus recommends
that you print this checklist and take it to the installation site.
Follow the steps listed in
to install your device. Details for each of these steps are provided on the pages indicated.
Shipping Carton Contents
Ruckus ICX 7850 devices ship with all of the following items included in the shipping carton. When unpacking the device, verify that the
contents of the shipping carton are complete. If any items are missing, contact the place of purchase.
•
The Ruckus ICX 7850 device
•
An accessory kit containing the following items:
-
Rack mounting kit containing two L-shaped mounting brackets and two sets of eight sink-head screws
-
Four rubber feet
-
One grounding kit, containing one grounding lug and two grounding screws
TABLE 7
Installation Tasks
Task
Number
Task
Where to Find More Information
Completed
1
Ensure that the physical environment that will host the device
has the proper cabling and ventilation.
2
If customizing a Ruckus ICX 7850 switch baseline chassis:
1.
Install at least one power supply unit.
2.
Install at least four fans.
“Inserting a New AC Power Supply”
“Inserting a New DC Power Supply”
“Inserting a New Fan Assembly”
3
Mount the device on a desktop or in a rack.
“Installing the Device on a Desktop”
“Four-Post Rack Mount Installation
(ICX-RMK-4POST-TL)”
“Installing the 1U, 1.5U, and 2U Universal Kit for
Four-Post Racks (XBR-R000295)”
4
Connect devices in a stack
“Connecting Devices in a Stack”
5
Plug the device into a nearby power source that adheres to the
regulatory requirements outlined in this manual.
“Providing Power to the Device”
6
Attach a terminal or laptop to the device. This will enable you to
configure the device through the command line interface (CLI).
“Establishing a First-Time Serial Connection”
7
Assign a password for additional access security. No default
password is assigned to the CLI.
Ruckus FastIron Command Reference Guide
8
Before attaching equipment to the device, you must configure
an interface IP address to the subnet on which the device will be
located. Initial IP address configuration is performed using the
CLI with a direct serial connection.
Ruckus FastIron Command Reference Guide
9
Connect network equipment to the system.
10
Test IP connectivity to other devices by pinging them and
tracing routes.
Ruckus FastIron Command Reference Guide
11
Continue configuring the device using the CLI.
Ruckus FastIron Command Reference Guide
12
Secure access to the device.
Ruckus FastIron Management Configuration Guide