Ruck Ventilatoren DHA EC CP 20 Series Installation, Operating And Maintenance Instruction Download Page 2

2

|  DHA...EC CP 20 / ...EC O CP S

EN

Installation, operating and maintenance instructions

2.  IMPORTANT INFORMATION

1. FOREWORD

Dear customers,
Thank you for choosing our device.
Before operating the unit, please read carefully these installation, operating and maintenance instructions. If you have 
any questions, please contact: (Contact details see page 1)
The data provided in these installation, operating and maintenance instructions are for the product description only. A 
statement about a certain condition or a suitability for a certain application cannot be derived from our information. 
The information does not release the user from his own assessments and examinations.
All rights reserved by the manufacturer, even in the event of industrial property rights.
Any disposal such as copying and distribution rights lies with us.

This manual contains important information on the safe and appropriate assembly, transport, commissioning, operation, 
maintenance, disassembly and simple troubleshooting of the product.
The product has been manufactured according to the accepted rules of current technology. 
There is, however, still a danger of personal injury or damage to equipment if the following general safety instructions and 
the warnings before the steps contained in these instructions are not complied with.

 

Read these instructions completely and thoroughly before working with the product.

 

Keep these instructions in a location where they are accessible to all users at all times.

 

Always include the operating instructions when you pass the product on to third parties.

2.1.  Applicable Documents

The following documents and information on the exhaust fan must be observed in addition to the installation, ope-
rating and maintenance instructions:

Other applicable standards:

 

DIN VDE 0100-100

 

DIN EN 60204-1

 

DIN EN ISO 13857

 

DIN EN ISO 12100

 

VDMA 24186-1

Available documents at www.ruck.eu

 

Installation, operating and maintenance instructions

 

Programming instruction FU (three-phase version)

 

EC Declarations of conformity

 

EC-Declaration of Incorporation (Directive 2006/42/

EC)

 

Commissioning report 

 

Call to Tender

 

Dimensioned drawing

 

Technical drawing DWG

 

Technical drawing DXF

 

3D STEP

Nameplate

Summary of Contents for DHA EC CP 20 Series

Page 1: ...D STORAGE 8 10 ASSEMBLY 9 11 ELECTRICAL CONNECTION 13 12 COMMISSIONING 15 13 OPERATION 15 14 MAINTENANCE AND CLEANING 21 15 LIFETIME AND DISPOSAL 22 16 TROUBLESHOOTING 22 ruck Ventilatoren GmbH Max Pl...

Page 2: ...the product The product has been manufactured according to the accepted rules of current technology There is however still a danger of personal injury or damage to equipment if the following general s...

Page 3: ...re 3 GENERAL SAFETY INSTRUCTIONS Planners plant engineers and operators are responsible for ensuring that the product is installed and operated correc tly Use our devices only in perfect technical con...

Page 4: ...area In this manual there are safety instructions before the steps whenever there is a danger of personal injury or damage to the equipment The measures described to avoid these hazards must be observ...

Page 5: ...Before performing any work on conductive parts al ways disconnect the unit completely from the electri city supply and make sure that it cannot be switched back on again Never reach into the impeller...

Page 6: ...functional and easy accessible Only authorized personnel is allowed to operate the setting mechanisms of the components or parts under the provision that the system is used as intended In an emergency...

Page 7: ...em number SN Serial number Product name Test date CE marking 6 DELIVERY CONTENTS 1 x roof fan with constant pressure control 1 x Installation operating and maintenance instructions EC Declarations of...

Page 8: ...weight see technical data It should be transported with suitable lifting equipment in the original packaging or on the transport equipment indicated If transported with a forklift it should be ensured...

Page 9: ...ssible for maintenance and cleaning purposes The unit should only be installed with authorized and suitable fastening materials at all fastening points Do not distort the unit when installing Just use...

Page 10: ...enance instructions 10 1 Mounting on roof socket DSF 10 2 Mounting of electrical connection Connection power supply Release screws 1 Remove cover 2 Perform the wiring according to the terminal diagram...

Page 11: ...scale drawing Protection Mark according to ISO16016 mm mm General tolerances DIN ISO 2768 mK 1 17 ruck Ventilatoren Max Planck Str 5 D 97944 Boxberg Accesorii DVN_4 Intern 04 129688 ruck Ventilatoren...

Page 12: ...i DVN_8 Intern 04 129688 62 736 kg A4 Do not scale drawing Protection Mark according to ISO16016 mm mm General tolerances DIN ISO 2768 mK 1 22 ruck Ventilatoren Max Planck Str 5 D 97944 Boxberg Acceso...

Page 13: ...rovided in the supply line Use a separate cable inlet for each cable Any cable inlets that are not used must be sealed so that it is airtight All cable inlets must have strain relief Create equipotent...

Page 14: ...eration electric motors heat up Under certain circumstances excessively high ambient or fluid temperatu res heavy contamination etc the motor temperature may exceed the safety limit of the electricall...

Page 15: ...in the duct Setting of the desired differential pressure see 13 Operation 13 OPERATION CAUTION Isolate electrical installation NIGHT DAY Adjust set point After removing the cover you have free access...

Page 16: ...easing and decreasing the set point for NIGHT 3 Control cable 4 Display OFF when regulator on when regulator off PA 150 50 0 13 2 1 Adjustment of the control unit parameter 5 sec M A 2 sec M A B or OF...

Page 17: ...settings menu menu P by pressing the ON OFF button which must be held down for approx 10 seconds Parameter P01 is displayed on the screen With the A and buttons on the control unit the individual P pa...

Page 18: ...rreicht setpoint reached DHA EC CP 20 EC O CP S EN Installation operating and maintenance instructions 13 3 Operation with Modbus communication interface 13 3 1 Wiring diagram 13 3 2 Interface informa...

Page 19: ...Reserved integer R W 40011 10 Set point day Pressure PA integer R W 40012 11 Set point night Pressure PA integer R W 40013 12 day night switching 0 Day time operation 1 Night time operation integer R...

Page 20: ...ressure PA integer R W 30006 5 Reserved integer R W 30007 6 Reserved integer R W 30008 7 Reserved integer R W 30009 8 Reserved integer R W 30010 9 Reserved integer R W 30011 10 Reserved integer R W 30...

Page 21: ...sily flammable products for cleaning impellers housing Preferably only water not flowing water or mild soapsuds should be used The impeller should be cleaned with a cloth or brush Never use a high pre...

Page 22: ...e disposed of professionally and properly after disas sembly in accordance with national and international laws and regulations The same applies to excipients in use such as oils and fats or other sub...

Page 23: ...rong direction wrong air transport direction High pressure losses in the system Return flaps closed or only partially open Duct system clogged Speed control incorrectly set incorrectly connected Note...

Page 24: ...t 17 11 2022 mdar_pb_16d_k10001_en We reserve the right to make changes Language English ruck Ventilatoren GmbH Max Planck Str 5 D 97944 Boxberg Windischbuch Tel 49 7930 9211 300 Fax 49 7930 9211 166...

Reviews: