- page 11 of 15
–
Inst ruct ion and operat ing manual CVS SiloKing 1500
Pow erband driven
(for-030/031013)
5
Maintenance installation
5.1
INSPECTION DURING OPERATION
A:
Check the oil manometer before every start -up. The oil pressure must not drop
below the minimum value of 0.3 bar, (normally 1-3 bar). When outside temperature
is low it may take a few seconds before the oil pressure is visible.
B:
Check the air filter indicator.
If the red mark is visible, the air intake filter is soiled and poses a risk of overheating
and damages.
C:
The safety valve must open at maximum air pressure.
This valve must NOT be used as blow -off valve. To prevent overheating in the
enclosure the valve at the silo tank must blow off before the compressor valve
does. (blow -off pressure 2.5 bar)
D:
Pay attention to any unusual sounds or peculiarities near the installation.