Section 6 Maintenance
P69AHD Manual
www.rottlermfg.com
6-26
Vertical Gib Adjustment
Gib adjustments can affect the sweep of the spindle front to back. With the indicator in the 6 O’clock
position (as you face the front of the machine) tightening the vertical gibs will lessen the pressure on the
indicator probe. Loosening the gib will increase the amount of pressure on the indicator probe.
Example:
If you have a reading of 0.0 on the indicator at the 6 O’clock position and -.002” in the 12
O’clock position, tightening the gibs will bring the front of the spindle up. Adjust the gibs until you are
within the factory specified .001” deviance.
To adjust the vertical gibs locate the screw at the top and bottom of the gibs.
Tightening Gibs
To tighten the gibs, loosen the lower screw. Start tightening the top screw until the correct alignment
is achieved. When the correct alignment is achieved, tighten the lower screw to lock the adjustment in
place.
Note: Adjusting the gibs too tight will cause sticktion and erratic movement in the vertical travel.
Loosening Gibs
To loosen the gibs, loosen the top screw. Start tightening the lower screw until the correct alignment is
achieved. When the correct alignment is achieved, tighten the upper screw to lock adjustment in place.
Note: Having the gibs too loose will cause erratic bore size and finish.
If you do not know how tight or loose the gibs are adjusted, you can remove the way wipers from the
top of the gib. When you look in at the gib you will see a horizontal scribe line on most of the gibs. This
can be aligned with the internal casting for a starting point. The gibs may need further adjustment at this
point. This is only recommended as a starting point.
If there are any questions on this procedure contact Rottler Manufacturing Service Department.
Summary of Contents for P69AHD
Page 2: ......
Page 4: ......
Page 10: ...Section 1 Introduction P69AHD Manual www rottlermfg com 1 5...
Page 20: ...Section 2 Installation P69AHD Manual www rottlermfg com 2 9 Side Dimensions...
Page 21: ...Section 2 Installation P69AHD Manual www rottlermfg com 2 10 Clearance Dimensions...
Page 22: ...Section 2 Installation P69AHD Manual www rottlermfg com 2 11 Leveling Bolt Locations...
Page 30: ...Section 2 Installation P69AHD Manual www rottlermfg com 2 19...
Page 90: ...Section 5 Operating Instructions P69AHD Manual www rottlermfg com 5 46...
Page 130: ...Section 5 Operating Instructions P69AHD Manual www rottlermfg com 5 86...
Page 162: ...Section 6 Maintenance P69AHD Manual www rottlermfg com 6 30...
Page 164: ...Section 7 Troubleshooting P69AHD Manual www rottlermfg com 7 1...
Page 169: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 4 P69AHD Control Panel...
Page 170: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 5 Spindle Unit Assembly Parts...
Page 171: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 6...
Page 172: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 7 Base...
Page 173: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 8 Base Parts List...
Page 174: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 9 Column...
Page 175: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 10 Column Parts List...
Page 176: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 11 Table...
Page 177: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 12 Table Parts List...
Page 179: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 14...
Page 181: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 16...
Page 182: ...Section 8 Machine Parts P69AHD Manual www rottlermfg com 8 17...
Page 184: ...Section 9 Options P69AHD Manual www rottlermfg com 9 2...
Page 186: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 2...
Page 187: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 3...
Page 188: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 4...
Page 189: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 5...
Page 190: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 6...
Page 191: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 7...
Page 192: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 8...
Page 193: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 9...
Page 194: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 10...
Page 195: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 11...
Page 196: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 12...
Page 197: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 13...
Page 198: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 14...
Page 199: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 15...
Page 200: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 16...
Page 201: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 17...
Page 202: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 18...
Page 203: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 19...
Page 204: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 20...
Page 205: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 21...
Page 206: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 22...
Page 207: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 23...
Page 208: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 24...
Page 209: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 25...
Page 210: ...Section 10 Material Data Safety Sheets P69AHD Manual www rottlermfg com 10 26...