11
A
B
C
D
A
B
19. Equalizing Cables:
A) Slightly raise each carriage assembly and depress the locking latch
assembly and lower carriages to lowest latch postion, Fig. 17.
A) Remove sheave cover, Fig. 17a.
Fig. 18 Detail
A Upper sheaves
B Cable 2
C Cable 1
D Lower sheaves
B) Refer to Fig. 18 for the general cable arrangement. First, run a
cable end up through the small hole in the lower tie-off plate, Fig.
19.
Fig. 19 Detail
A Upper cable tie off plate and 13mm
nylon insert lock nut
B Lower cable tie off plate and 13mm
nylon insert lock nut
C) Push cable 1 up until the stud is out of the carriage top opening.
D) Run a nylon insert locknut onto cable 1 stud so 13mm of the stud
extends out of the locknut.
E) Pull cable 1 back down, Fig. 19.
F) Run cable 1 around the lower sheave, then up and around
overhead sheave and across and down to the opposite carriage,
Fig. 19. Install sheave cover, Fig. 17a.
G) Fasten cable 1 end to the carriage upper tie-off bracket. Tighten the
locknut enough to apply light tension to the cable.
H) Repeat procedure for cable 2. Adjust the tension of both cables
during the final adjustments in section 31.
Fig. 19
Fig. 17a
Fig. 18
Fig. 17
Summary of Contents for SPOA3TE 600 Series
Page 22: ...22 NOTES...
Page 23: ...23 NOTES...