I
N
S
T
A
L
O
R
U
C
© June 2008 by Rotary Lift. All rights reserved. CO6962.4
IN20417
Rev. F 14/03/2016
SPO54
E And M
(600 & 700 Series)
Two Post Surface Mounted Lifts
Rheinland
TUV
Page 1: ...R U C T I O N S I N S T A L L A T I O N I N S T R U C T I O N S June 2008 by Rotary Lift All rights reserved CO6962 4 IN20417 Rev F 14 03 2016 SPO54 E And M 600 700 Series Two Post Surface Mounted Li...
Page 2: ...Fig 1 Fig 2 A B C D E F G H I J A B C D E F G H I J 2...
Page 3: ...Detail A 737mm B 1829mm Minimum to nearest obstruction or bay 2134mm minimum nearest wall C 1422mm D Power Unit E 3962mm Minimum to nearest obstruction F 14 20mm Anchors G Apporach H 165mm Minimum to...
Page 4: ...e plate backs must be square on center line of lift Notches are cut into each base plate to indicate center line of lift Using appropriate equipment raise carriage to first latch position Be sure lock...
Page 5: ...o not tighten to 200Nm 20 4kg m installation torque replace concrete under each column base with a 1219mm x1219mm x 152mm thick 20N mm2 minimum concrete pad keyed under and flush with the top of exist...
Page 6: ...itch Bar to overhead as shown using 2 19mm spacer and 1 4 20NC Lock Nut Tighten Hex bolt leaving 1 6mm gap between the spacer and the overhead assembly 9 Overhead With a ladder by each column two peop...
Page 7: ...r Plate as shown in Fig 10 using 4 8 32NC x 3 8 Socket Head Cap Screws Re attach Control Panel Cover D Install and hand tighten Branch Tee to pump until O ring is seated Fig 11 Continue to tighten the...
Page 8: ...rocedure to tighten the Female Swivel Tee to the Male Extension 12 Flared Fittings Tightening Procedure A B Flared Fittings Tightening Procedure 1 Screw the fittings together finger tight Then using p...
Page 9: ...15 Overhead hose goes over top end of overhead assembly Fig 16 14 Oil Filling Remove fill breather cap on power unit Fig 13 14 Fill to MIN____ mark on tank with Dexron III ATF or hydraulic fluid that...
Page 10: ...ack down Fig 18 F Run cable around the lower sheave then up and around overhead sheave and across and down to the opposite carriage Fig 17 Install sheave cover Fig 15 G Fasten the cable end to the car...
Page 11: ...ge of the column on the NON APPROACH side F Continue routing cable to the left column latch cable guide Fig 21a Fig 21b routing the cable through the left column latch cable guide Fig 21b IMPORTANT Us...
Page 12: ...lot and the latch dog pin Fig 21a M Using Pliers pull cable tight and secure the clamp close to the shoulder screw Tighten clamp Fig 21b Detail A Attach to extension using wire tie Use hole closest to...
Page 13: ...uit Breaker 230v 1 20A Over Current Protec tion K 230v 1 20A Circuit breaker at electrical supply Fig 24 17 Electrical Have a certified electrician run power supply to motor Fig 24 24a Size wire for a...
Page 14: ...to Section 29 Fig 24a Fig 25 T1 T2 T3 A1 L1 L2 L3 A2 PE L1 L2 L3 N A B C D D E F G G H I J K MOTOR OPERATING DATA THREE PHASE T Models 400 415 Volts 50Hz LINE VOLTAGE CURRENT POWER 10A 4 9Kw Fig 24a D...
Page 15: ...ster control panel over locking latch to column on the 5 16 18NC x 3 8 PHMS screws and pull the locking latch solenoid wire through the panel Fig 27 Plug locking latch solenoid into master control pan...
Page 16: ...mounts on the power unit side C Access Panel D 5 16 18NCx3 8 PHMS Through the control panel E Tool Holder F 5 16 18NCx3 8 PHMS Fig 27 Detail G Pull connector through panel H Overhead Switch Cable I Ma...
Page 17: ...to lowering valve and tighten screw on top Fig 30 C Run the motor cable though strain relief in the motor junction box Motor wiring and wire diagrams are detailed in Fig 32 23 Installing Slave Control...
Page 18: ...ster control panel goes through stra in relief into junction box on powerunit motor D Strain Relief E Grommet Note Secure all cables coming up from master control panel to grommet hole with a wire tie...
Page 19: ...e column and to the facility s main air supply Air fitting provided to make connection to main air supply Figs 31 and 31a B Wire the disconnect harness into the bottom of the slave side disconnect as...
Page 20: ...connects into the top of the discon nect B Power harness to Master Control panel connects into the bottom of the disconnect C Connection plugs into solenoid D Connection plugs into back of slave panel...
Page 21: ...trol modules can be affected by voltage irregularities It is the lift owner s responsibility to ensure that adequately protected power sources are available for connecting this equipment NOTES 1 Unit...
Page 22: ...3 6 4 5 1 2 3 6 4 5 Black Black Black Green Yellow Red NP823 REVISION Blue Black Red Red Red Red Red Red Black Green Yellow 1 4 6 Blue Black Green Yellow Blue Green Yellow Black Black Black Black Blac...
Page 23: ...8NCx3 8 BHCS that hold down the black enclosure and loosen them by 3 or 4 turns Fig 33 Also loosen the 2 upper and 1 lower 5 16 18NCx3 8 PHMS that hold the control unit to the column Fit the gasket be...
Page 24: ...e black enclosure make sure to plug in all connections and reinstall with 4 5 16 18NCx3 8 BHCS Fig 33a Tighten down the mounting screws until the gasket makes a good seal with the column Do not over t...
Page 25: ...N position from the master control panel Fig 34 Note Lift can only be powered up from the Master Control Side The Slave Control side only runs the lift Fig 34 Fig 34 A Raise Lift B Lower Lift C Lower...
Page 26: ...e cover of the control assembly to install the wiring chase and maintain seal position Snap the front of the wire chase into the column Next slide the 1 meter cover up into the column extension and th...
Page 27: ...e side of gear marked TOP is facing upward Fig 36b NOTE TOP is stamped on top side of gear You may need to pull up on the pin ring to allow enough room to install Restraint Gear Then install the 3 3 8...
Page 28: ...fts Install latch release decal on cover above latch release handle Fig 40 32 Door Bumper Installation All Models 1 Press 457mm bumper on column edge Fig 41 2 Press 152mm bumper on top front edge and...
Page 29: ...point A D B C Fig 39 Fig 40 Fig 41 Fig 39 Detail A 6 5 16 Flat Washers B 2 5 16 Spring Lock Washers C 2 5 16 18NC HHCS per arm D Arm Guard For SPO40M the different arm guard goes on the right front a...
Page 30: ...fill breather cap CAUTION If fill breather cap is lost or broken order replacement Reservoir must be vented 38 Pressure Test for M Series lifts Run lift to full rise and keep motor running for 5 seco...
Page 31: ...NOTES...
Page 32: ...own Installation Instructions SPO54 E and M series_en_print_IN20417_2016_03 Rev F European Headquarter BlitzRotary GmbH H finger Stra e 55 D 78199 Br unlingen Telefon 49 771 9233 0 Telefax 49 771 9233...