Set the middle clamp flush with the
PV Panel frame. And torque the
side M8 screw.
Middle clamp installation
First row installation
APEX Second & Middle Row Installation
・
32-40 mm frame height
・
Universal End clamp
・
up to 1 9/32” leveling
・
Integrated cable holder tray
RT-APEX Middle Clamp
Height adjustment shall be done after panels
are set in place.
7
Torque the middle clamp
Slide the PV panel in. NO need to
un-tighten it since the clamp has
been set..
IMPORTANT!!
Clamp torque values vary between 16Nm
to 18Nm (verify Installation Manual
appendix for proper value)
*
Location for additional SDST screw
(verify
*
values on the PE Report)
IMPORTANT!!