APEX End Row Installation
8
At the ridge side or top row,
the end clamp must be fully
untightened and rotated 180
degrees. The bottom bracket
and pillar are installed same
as the others.
IMPORTANT!!
Slide the end clamp toward to
PV Panel frame and torque the
side screw M8 to fix base and clamp.
Torque the end clamp
End clamp installation
Height adjustment
shall be done after
panels are fixed.
Note: Top row clamp rotation
applies to the splice clamp as
well. Follow instruction above.
*
*