APEX First row installation
Important Step for a Smooth Skirt set up.
Use strings to align the first row, and set
the bottom side socket head cap screw.
4
*Place End clamp or End
Splice to the base.
First row alignment
Please torque the M8 screw before
installing the panel once it is aligned.
M-8 Torque to 12Nm (9 ft-lb)
IMPORTANT!!