Page 2.1
RB12 Aero - DUAL Installation Manual | February 2017
© Copyright 2017 | Rollease Acmeda Group
SECTION 2
−
INSTALLATION
PART A
– PREPARING INSTALLATION SPACE
STEP 1 – ENSURE TOP OF INSTALLATION SPACE IS LEVEL
PART B
– MOUNTING CLIP INSTALLATION
STEP 1 – INSTALL MOUNTING CLIPS TO WALL / CEILING USING APPORPRIATE FIXINGS TO SUIT APPLICATION
WALL MOUNT
CEILING MOUNT
NOTE: Install Mounting Clips as required
Shade Width (ft)
No. Of Brackets
0 - 3.90
2
3.91 – 6.52
3
6.53 – 9.15
4
9.16 +
5