STEP 6 – TWIST CASSETTE COVER ONTO TOP & CLIP INTO PLACE 

 

 

STEP 7 – SLIDE END CAP COVERS OVER CASSETTE END CAPS 

 

 

 

Summary of Contents for RB12 AERO-DUAL

Page 1: ...RB12 AERO DUAL INSTALLATION MANUAL February 2017 ...

Page 2: ...an adequately support the load The Installer is responsible to ensure that the devises used to anchor the product to the supporting structure are suitable for the application The fasteners provided are intended for fixing to timber The installer is responsible for selecting fasteners that are suitable for other substrates SAFETY INFORMATION Ensure that electrical works are done only by a LICENSED ...

Page 3: ...Group SECTION 1 ITEMS REQUIRED TOOLS REQUIRED 5mm Socket Ratchet Drill Drill Bits Measuring Tape Pencil Screw Driver Flat Head SHADE ITEMS REQUIRED Check you have all items required to complete installation 1 Shade Cassette Assembly 2 2 x End Cap Covers 3 2 or 3 as required x Mounting Clips ...

Page 4: ...ING INSTALLATION SPACE STEP 1 ENSURE TOP OF INSTALLATION SPACE IS LEVEL PART B MOUNTING CLIP INSTALLATION STEP 1 INSTALL MOUNTING CLIPS TO WALL CEILING USING APPORPRIATE FIXINGS TO SUIT APPLICATION WALL MOUNT CEILING MOUNT NOTE Install Mounting Clips as required Shade Width ft No Of Brackets 0 3 90 2 3 91 6 52 3 6 53 9 15 4 9 16 5 ...

Page 5: ...lation Manual February 2017 Copyright 2017 Rollease Acmeda Group PART C SHADE CASSETTE INSTALLATION STEP 1 INSTALL SHADE CASSETTE ONTO MOUNTING CLIPS Rest Cassette Top on Mounting Clips and rotate to secure Ensure clips are engaged ...

Page 6: ...nge indicated below to find locked position and provide a Release Allowance for raising the shade iii TUG Back Bottom Rail or Back Chain Shade will automatically rise NOTE As limits are not set ensure Bottom Rail is controlled so shade doesn t spring into Cassette and damage fabric If Bottom Rail raises at the desired speed the correct number of pre turns have been assigned Further adjustments may...

Page 7: ...RE TURNS Ensure Shade is Unlocked UNLOCKED SHADE Shade on way up or reached the top Insert Socket Ratchet rotate in direction of on Cassette End Cap until shade rises to the original start position top limit NOTE If there is insufficient space to rotate Socket Ratchet within installation Shade Cassette to be removed from Mounting Clips to undertake process Insert Socket Ratchet rotate in direction...

Page 8: ...CK SHADES i BACK SHADE Pull Bottom Rail or Back Chain Down to mid location ii FRONT SHADE Pull Bottom Rail or Front Chain Down to mid location to match first shade Result 1 Shades Align no further action required Result 2 Slight misalignment pretension tweaking required see below CORRECTING MISALIGNMENT Insert Socket Ratchet into Front Shade Cassette End Cap rotate slightly in required direction u...

Page 9: ...T LIMITS STEP 1 REMOVE CASSETTE COVER STEP 2 ENSURE LIMITERS ARE UNLOCKED UNLOCKED Both Limiter Buttons out LOCKED One or both Limiter Buttons in STEP 3 SET TOP LIMIT Front adjustment installation with back shade shown as example i Set Shade at Top Limit using Chain or Bottom Rail ii Push Top Limit Button ...

Page 10: ...ocket installations when front cannot be accessed Top and Bottom Limit Buttons are indicated by arrow direction on End Caps closest to each button NOTE If the Limiters have been installed in incorrect orientation for accessibility refer to Assembly Manual Section 4 Part E Step 4 Uninstalling Limiter Repeat for 2nd shade STEP 4 SET BOTTOM LIMIT Front adjustment installation with back shade shown as...

Page 11: ...ii Manually roll Shade down to bottom of Release Allowance Alternative Option To avoid gripping fabric insert Flat Head Screw Driver into Grooves of Limiter and rotate Shade down to bottom of Release Allowance iii Hold Shade in down position and push Bottom Limit Button Repeat for 2nd shade 33mm ...

Page 12: ...ions Manual Section 1 Part B ADJUSTING TOP LIMIT i Ensure Shade is at current Top Limit ii Unlock Top Limit iii Set new Top Limit refer Step 3 ADJUSTING BOTTOM LIMIT i Ensure Shade at current Bottom Limit ii Manually roll Shade down to bottom of Release Allowance Refer Step 4 ii iii Hold Shade in down position Unlock Bottom Limit iv Set new Bottom Limit refer Step 4 If Pre Tensioning needs to be a...

Page 13: ...Page 2 10 RB12 Aero DUAL Installation Manual February 2017 Copyright 2017 Rollease Acmeda Group STEP 6 TWIST CASSETTE COVER ONTO TOP CLIP INTO PLACE STEP 7 SLIDE END CAP COVERS OVER CASSETTE END CAPS ...

Page 14: ...s B C D of this manual TIP Ensure each shade has the same number of pre tensions as the 1st Shade Ensure each shade is aligned correctly with the 1st Shade refer to Section 2 Part D Step 3 for correcting slight misalignment NOTE If the shade pre tension is to be adjusted and there is insufficient space to rotate Socket Ratchet within installation Shade Box to be removed from Mounting Clips to unde...

Page 15: ...TOP LIMIT a Position Shade fully retracted b Unlock top limit button c Lower Shade to half height d Lock top limit button e Raise Shade until limit is found If limit not found repeat steps a e BOTTOM LIMIT a Position Shade fully lowered b Unlock bottom limit button c Raise shade to half height d Lock bottom limit button e Lower Shade until limit is found If limit not found repeat steps a e ...